Complete HMO Reconfiguration Project Begins in Wavertree

Featured Image
Mark Barrow
Published: August 7, 2025

Transforming a HMO Investment Property Through Quality Refurbishment

Mark Barrow

Project Overview

Urbanex Construction has commenced work on another significant property transformation in Liverpool’s popular Wavertree area. This comprehensive 6-month project involves the complete reconfiguration of an 8-bedroom HMO, converting it to modern en-suite accommodation that meets current standards and tenant expectations.

Located in one of Liverpool’s established residential areas, this Victorian property required a thorough approach to deliver the quality and functionality that today’s property investment market demands.

The Challenge: Why Strip Back to Bare Brick?

When we assessed this 8-bedroom HMO, it became clear that surface-level improvements wouldn’t deliver the transformation needed. The property hadn’t been refurbished for 12 years and was looking and feeling distinctly dated, no longer meeting the standards that today’s tenants expect or commanding the rental rates that property investors require.

The decision to strip the property back to bare brick was driven by both the property’s condition and the owner’s goal to maximise rental income. Most importantly, the existing layout made it impossible to add en-suite bathrooms to each bedroom, a crucial upgrade that can significantly increase rent per room in Liverpool’s competitive HMO market.

Our comprehensive approach addresses these challenges while delivering long-term value:

Addressing 12 Years of Wear and Tear

After more than a decade without major refurbishment, the property showed significant wear across all systems and finishes. Rather than applying cosmetic fixes over ageing infrastructure, we’re creating a property that will perform reliably for years to come.

En-Suite Revenue Opportunity

The existing layout prevented the addition of en-suite bathrooms, a key factor limiting rental income. By stripping back to bare brick, we can redesign the space to accommodate 8 en-suite bedrooms, allowing the owner to maximise rental income with facilities that modern renters demand.

Complete Layout Freedom

Removing all non-structural internal walls gives us complete flexibility to redesign the space efficiently. Rather than working around an outdated room configuration, we can create optimal layouts that maximise both space utilisation and rental potential.

Modern Infrastructure Integration

Victorian properties often have outdated electrical, plumbing, and heating systems retrofitted over decades. Starting from bare brick allows us to install modern infrastructure properly, ensuring reliability and compliance with current building regulations.

Quality Assurance

Surface renovations can mask underlying issues. By stripping back completely, we identify and resolve any structural, damp, or building fabric issues before they become problems for tenants or property owners.

Long-term Value

Property investors understand that comprehensive refurbishment, while requiring higher initial investment, delivers better rental yields and lower maintenance costs over the property’s lifecycle.

Project Scope and Timeline

Duration: 6 months

Completion: Expected February 2026

Key Project Elements:

Month 1-2: Strip-out and Infrastructure

  • Complete internal strip-out to bare brick (completed)
  • Structural assessment and any necessary repairs
  • Installation of new electrical, plumbing, and heating systems
  • Insulation and damp-proofing upgrades

Month 2-4: Construction and Layout

  • Installation of new internal walls for optimal room configurations
  • Creation of 8 en-suite layouts with modern bathroom specifications
  • Plastering and preparation for final finishes
  • Window and door installations

Month 4-6: Fitting and Finishing

  • Kitchen installation and appliance fitting
  • Bathroom suite installations across all 8 en-suites
  • Flooring throughout the property
  • Decoration and final fixtures
  • Safety installations including fire safety systems
  • Final inspections and compliance certifications

The local Connection

This project continues Urbanex’s successful track record on Hartington Road. Our previous Hartington Road restoration project of two war-damaged Victorian properties demonstrated our expertise in handling complex period property conversions while respecting their architectural heritage.

Each Hartington Road project brings its own challenges, but our approach remains consistent: thorough planning, quality execution, and delivery that exceeds client expectations.

Why Choose Comprehensive Refurbishment?

Property investors increasingly recognise that comprehensive refurbishment delivers superior returns compared to cosmetic improvements:

Higher Rental Yields

Modern en-suite HMO accommodation commands premium rents in Liverpool’s competitive student and young professional market.

Reduced Void Periods

Quality accommodation with modern facilities attracts and retains tenants more effectively than outdated properties.

Lower Maintenance Costs

New infrastructure and quality finishes reduce ongoing repair and maintenance expenses.

Regulatory Compliance

Purpose-built en-suite layouts ensure compliance with HMO licensing requirements and building regulations.

Project Updates

We’ll be sharing regular updates on this transformation throughout the 6-month project timeline. Follow our progress on our LinkedIn and Instagram pages or check back here for updates showing the property’s evolution from bare brick to modern accommodation.

For Liverpool property investors seeking comprehensive refurbishment services, Urbanex Construction delivers quality transformations that maximise property potential and rental yields.

Contact us to discuss your property refurbishment requirements.


Urbanex Construction: Liverpool’s trusted construction and refurbishment specialists with over 25 years of experience delivering quality projects across the North West.